They finished filling in the deep hole along the 2818 side with compacted sand.  They also drilled holes in the ground in front of the library, inserted round metal rebar cages and filled them with concrete.  Then after all that work of bringing in the sand and compacting it, they removed some of it around the concrete they poured to form a trench in preparation for more concrete hopefully.

spreading sand on 2818 side of building May 11 2018 digging holes in front of library May 11 2018 pouring cement May 11 2018 digging a trench in front of the library May 11 2018

 